¨Newaz Steel Limited founded in 2009. Located 49km from Dhaka on the Dhaka-Maymensing Highway, the facility built over an area 11000 sqm (118404 sqft). The manufacturing plant stands 7500 sqm (80730 sqft) floor area. Capacity being 18000 ton per year.